April 17, 2023
North Connex Automated Drill Rigs
December 15, 2019
Hydra-Wash designed and manufactured 2 automated Drill rigs for the wall paneling in the North Connex Tunnel Project.
Or request a callback.
Hydra-Wash designed and manufactured 2 automated Drill rigs for the wall paneling in the North Connex Tunnel Project.